Sunday, July 9, 2023

Session 4

Day. 7.5 hours. Total: 16.5 hours.

  • CNC cut 1/2" bulkheads and deck knees
  • Stitched bulkheads into place
  • Played the alignment game and tightened copper stitching all around
  • Filleted about 75% of all joins thickening with a mixture of 80% cabosil \ 25% Q-Cell. Medium size fillets.



Longer session today.. Normally I'll make filleting day a monster with filleting, glassing in tape over fillets when 80% cured to take advantage of chemical bond. Ran out of cabosil today along with a bit of energy towards the end of the day. Tomorrow will be order day from US Composites..












No comments:

Post a Comment