Day. 7.5 hours. Total: 16.5 hours.
- CNC cut 1/2" bulkheads and deck knees
- Stitched bulkheads into place
- Played the alignment game and tightened copper stitching all around
- Filleted about 75% of all joins thickening with a mixture of 80% cabosil \ 25% Q-Cell. Medium size fillets.
Longer session today.. Normally I'll make filleting day a monster with filleting, glassing in tape over fillets when 80% cured to take advantage of chemical bond. Ran out of cabosil today along with a bit of energy towards the end of the day. Tomorrow will be order day from US Composites..
No comments:
Post a Comment