18' Trimaran with Telescoping Beams and Nacra 5.2 Hulls and rig
Friday, July 7, 2023
Session 3
Day: 2.5 hours. Total. 9 hours
Planed bevel into upper panels lower edges.
Stitched Upper panels to lower panels - everything loose
Cut Angles in sheer clamp for stem using the sight to aft corner trick.
Trimmed sheer clamps
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment