- Hours: 5.0
- Total Hours: 79.5
Over the past week:
- Float test to make sure it.. well.. floats. And to test that the amas are in the correct position. Wound up raising the aft tube 4" and the forward tube 2". Probably going to be a bit too high..
- Raised the mast
- Tinkered with the rigging
- Added supports on the trailer
- Fitted 3D printed bushings.
No comments:
Post a Comment