Hrs: 2.25 - Total: 23.25
- Cut out ring frame and deck supports.
- Laminated deck supports and ring frame into hull
- More 2" tape for sections 3 and 4
Taping tools. My workflow here: Dab epoxy into seams with the brush for all seams to be worked on. Lay the pre-cut tape onto the seam. Dab it in with brush and wet out epoxy with brush. Remove excess resin with roller and us epoxy picked up from roller on bulkheads not pre hot-coated. Seems to work on the end.
Ring Frame and Deck Frames.
CNC Cutting out ring frame.
No comments:
Post a Comment